Project Duration: January 2006 – January 2007
Project Features: Project Management for Butadiene Storage Sphere
Works Included: Co-ordination of multiple trades to install a massive, prefabricated storage sphere for highly flammable butadiene.

 

Project Outline:

  • Preliminary site preparation; including site clearing, construction of amenities, temporary power, gas supply and fencing.
  • Preparation of documentation for tenders.
  • Provision of a Construction Manager, Scheduler, Site Engineers and Supervisors.
  • Provision of drafting service and detailed process engineering.
  • Management of the electrical, instrumentation civil and structural consultants.


Working with client representatives Synertec managed:

  • Construction of roadways, platforms, and walkways as well as various bunds, fire system bunker and sphere pilings.
  • Shipping, offloading, testing and commissioning of the 4000m³ – 350kPa insulated sphere that was fabricated in Taiwan.
  • Procurement, supply and fitting of  relief valves, bursting discs, pressure transmitters, temperature transmitters, control room indicators, excess flow valves and isolation valves.
  • Procurement, supply and installation of tanker loading pumps, refrigeration pumps, refrigeration plants as well as combuster.
  • Supply and installation of conduits / cable trays, cabling from MCC to field equipment, cable MCC to control panel, PLC, instruments in control room, lighting – roadways, lighting - sphere / pumps, marshalling boxes, cables from marshalling boxes to field instruments , earthing for sphere, bridging straps for pipework.
  • Alterations to the tanker access system and PC items.
  • Supply / upgrade to the existing CITEC system.
  • Electrical supervision / inspection, electrical commissioning and continuity testing.
  • Installation and integrated of the gas detection system
  • Supply / installation of cable pumps N2 seal systems, dockline temperature transmitters.
  • The Integration of fire system into the existing Fire Indicator Panel.
  • Installation, testing and commissioning of fire the protection system.
  • Design and installation of Service lines for air, nitrogen and potable water, safety showers, and natural gas pipework.
  • Hydrostatic pressure testing of sphere, product lines and fire system.
  • Provided Operational and Maintenance Manuals and training.

 

« BACK

 

Latest News

 

Synertec Delivers Seminars on Cost Effective Quality Management Systems
09-Dec-2011

Synertec Asia Pte Ltd joined with other regional industry leaders, Sparta Systems, HGP Healthcar..

Aegis Partners with Synertec Asia to Provide DISCOVERANT Support in Southeast Asia
08-Dec-2011

Synertec Asia to Provide Full-Service Support of Aegis Applic..

 

Synertec joins forces with Honeywell Process Solutions
31-Mar-2011

Synertec Asia is selected as a multi-platform industrial solution provider for Honeywell process aut..

Dr. Nick Kotlarski presented at GMP Asia Conference 2010
24-Feb-2010

Dr Nick Kotlarski, Principle Consultant, Biopharmaceuticals from Synertec Asia Pte Ltd presented..

Jon Reich presented “Qualification of IT infrastructure - How much is too much?” at ISPE Conference
15-Sep-2009

Download the presentation here (presentation.html) It is important for Life Science companie..