Butadiene
|
|
Project Management Services
| Project Duration: |
January 2006 – January 2007 |
| Project Features: |
Project Management for Butadiene Storage Sphere |
| Works Included: |
Co-ordination of multiple trades to install a massive, prefabricated storage sphere for highly flammable butadiene. |
Project Outline:
- Preliminary site preparation; including site clearing, construction of amenities, temporary power, gas supply and fencing.
- Preparation of documentation for tenders.
- Provision of a Construction Manager, Scheduler, Site Engineers and Supervisors.
- Provision of drafting service and detailed process engineering.
- Management of the electrical, instrumentation civil and structural consultants.
Working with client representatives Synertec managed:
- Construction of roadways, platforms, and walkways as well as various bunds, fire system bunker and sphere pilings.
- Shipping, offloading, testing and commissioning of the 4000m³ – 350kPa insulated sphere that was fabricated in Taiwan.
- Procurement, supply and fitting of relief valves, bursting discs, pressure transmitters, temperature transmitters, control room indicators, excess flow valves and isolation valves.
- Procurement, supply and installation of tanker loading pumps, refrigeration pumps, refrigeration plants as well as combuster.
- Supply and installation of conduits / cable trays, cabling from MCC to field equipment, cable MCC to control panel, PLC, instruments in control room, lighting – roadways, lighting - sphere / pumps, marshalling boxes, cables from marshalling boxes to field instruments , earthing for sphere, bridging straps for pipework.
- Alterations to the tanker access system and PC items.
- Supply / upgrade to the existing CITEC system.
- Electrical supervision / inspection, electrical commissioning and continuity testing.
- Installation and integrated of the gas detection system
- Supply / installation of cable pumps N2 seal systems, dockline temperature transmitters.
- The Integration of fire system into the existing Fire Indicator Panel.
- Installation, testing and commissioning of fire the protection system.
- Design and installation of Service lines for air, nitrogen and potable water, safety showers, and natural gas pipework.
- Hydrostatic pressure testing of sphere, product lines and fire system.
- Provided Operational and Maintenance Manuals and training.
« BACK
|
|
|
|
|
|
Latest News
Synertec Asia Pte Ltd joined with other regional industry leaders, Sparta Systems, HGP Healthcar..
Synertec Asia to Provide Full-Service Support of Aegis Applic..
Synertec Asia is selected as a multi-platform industrial solution provider for Honeywell process aut..
Dr Nick Kotlarski, Principle Consultant, Biopharmaceuticals from Synertec Asia Pte Ltd presented..
Download the presentation here (presentation.html)
It is important for Life Science companie..
|
|