New Manufacturing Facility
|
|
| Project Duration: |
January 2006 - December 2007 |
| Project Features: |
Manufacturing facility, including process design and utilities |
| Works Included: |
A facility design project involving multi purpose manufacturing facilities and support infrastructure. |
Project Outline:
- Synertec was initially contracted to undertake a Front End Engineering Design (FEED) study. Subsequently Synertec was involved in the Detailed Design work incorporating:
- Equipment selection including Purified Water system
- Process and personnel flows
- Manufacturing facility layouts
- Wall and floor finishes and details
- Environmental control, including HVAC, chilled water and extraction systems
- Electrical design
- Automation systems