XepaSP, Malacca, Malaysia

New Manufacturing Facility

Project Duration: January 2006 - December 2007
Project Features: Manufacturing facility, including process design and utilities
Works Included: A facility design project involving multi purpose manufacturing facilities and support infrastructure.

 

Project Outline:

  • Synertec was initially contracted to undertake a Front End Engineering Design (FEED) study. Subsequently Synertec was involved in the Detailed Design work incorporating:

- Equipment selection including Purified Water system
- Process and personnel flows
- Manufacturing facility layouts
- Wall and floor finishes and details
- Environmental control, including HVAC, chilled water and extraction systems
- Electrical design
- Automation systems

« BACK

 

Latest News

 

Synertec Delivers Seminars on Cost Effective Quality Management Systems
09-Dec-2011

Synertec Asia Pte Ltd joined with other regional industry leaders, Sparta Systems, HGP Healthcar..

Aegis Partners with Synertec Asia to Provide DISCOVERANT Support in Southeast Asia
08-Dec-2011

Synertec Asia to Provide Full-Service Support of Aegis Applic..

 

Synertec joins forces with Honeywell Process Solutions
31-Mar-2011

Synertec Asia is selected as a multi-platform industrial solution provider for Honeywell process aut..

Dr. Nick Kotlarski presented at GMP Asia Conference 2010
24-Feb-2010

Dr Nick Kotlarski, Principle Consultant, Biopharmaceuticals from Synertec Asia Pte Ltd presented..

Jon Reich presented “Qualification of IT infrastructure - How much is too much?” at ISPE Conference
15-Sep-2009

Download the presentation here (presentation.html) It is important for Life Science companie..