New Manufacturing Facility
| Project Duration: |
January 2003 - September 2003 |
| Project Features: |
Research & QC Laboratories, RO water system, Reticulated services, Dust containment & extraction, Office fit-out |
| Works Included: |
A facility “design and construct” project involving extensive R&D laboratories, GMP manufacturing facilities and administration offices. |
Project Outline:
- Synertec was initially contracted to undertake a Front End Engineering Design (FEED) study. The study included:
- Equipment selection
- Process and personnel flows
- Manufacturing facility layouts
- R&D laboratory layouts
- Wall and floor finishes
- Environmental control initiatives, including cascading pressure regimes and HVAC
- Critical elevation development
- Solid and Trade Waste disposal
- Town Planning considerations
- At the completion of the study Synertec provided a firm quotation, and was subsequently contracted to build the facility on a Lump Sum Turn Key basis.